Skip to main content
← Installation
CatalogInstallation

Parquet and flooring installation


Installation as a continuation of the manufactory

We do not outsource laying to third parties. Installers know each batch construction and finish — ensuring joints with doors, skirting and built-ins from the same wood.


Traditional

Traditional

  • Substrate assessment and datum zero.
  • Moisture-resistant plywood on PU adhesive with subsequent sanding.
  • Parquet bonded on PU adhesive with perimeter moisture barrier.
Modern

Modern

  • Substrate preparation and reinforced primer.
  • Parquet on silane adhesive without a plywood layer.
  • Junction checks and finish protection after laying.
Historic

Historic

  • Timber joists on rough substrate.
  • Lower and upper moisture-resistant plywood layers with sanding of each layer.
  • Artistic or strip parquet preserving historic geometry.
Artistic

Artistic

  • Substrate preparation and datum zero for complex patterns.
  • Multi-stage sanding and precise assembly of decorative modules.
  • Multi-layer oil or lacquer finish with joint and pattern control.

Subfloor diagnostics

Moisture, flatness, adhesion. No laying until the base meets spec.

Acclimation and layout

Material conditioned to target climate. Layout aligned with light and axes.

Laying and moisture barrier

Traditional plywood or direct bond. Perimeter expansion gap and adhesive control.

Sanding and finish

Multi-stage sanding, optional tinting, oil or lacquer per layer schedule.

Handover

Acceptance protocol, care guide and service card. Author supervision on key stages.


Our installation principles

Substrate and datum zero

Substrate check and datum zero — base for clean junctions.

Moisture under control

Substrate and material moisture within tolerance before start.

Specification for the project

Method, adhesive and finish protection matched to the site.

Handover with guidelines

Geometry check, junctions and operating instructions.


Quality checkpoints

  • Subfloor and material moisture within tolerance
  • Flatness ≤ 2 mm per 2 m
  • Pattern without cumulative error
  • Finish coordinated with doors and panels

Discuss parquet installation

Describe the site — we will prepare a work plan and crew schedule.

Request consultation
Parquet & flooring installation | Cardinal Hall