← Installation





Doors, stairs & panels
Cardinal Hall · Installation
Three directions — one installation logic. Each page: stages, photos and quality checks.
- Colour and grain — one batch; agreed on a sample in your lighting.
- Joints to floor, skirting and architraves — one profile, no steps.
- Seasonal gaps in the nodes; care guide and service adjustment after handover.

Our installation principles

Substrate and datum zero
Substrate check and datum zero — base for clean junctions.
Moisture under control
Substrate and material moisture within tolerance before start.
Specification for the project
Method, adhesive and finish protection matched to the site.
Handover with guidelines
Geometry check, junctions and operating instructions.
Directions

Installation of doors and portals
Opening geometry, even gaps, hardware tuning — stable in every season.
Learn more →
Installation of panels and boiserie
Stable panel and boiserie installation: unified layout, precise junctions and predictable wall geometry.
Learn more →
Installation of stairs and railings
Stable stair and railing installation: precise nodes, structural stiffness and quiet use.
Learn more →