On-site installation and assembly
Installation
Cardinal Hall · Installation
Specification-led installation: substrate diagnostics, datum "zero" leveling, perimeter moisture barrier and finish protection through handover.
First we record the site technical conditions, then select the technology and only then begin installation. We follow engineering logic: stable geometry, controlled humidity, aligned colour and joints — predictable performance in use.

Installation

Parquet
In-house flooring installation: substrate, technology, sanding and finish to specification.
Learn more →
Kitchens & furniture
Level installation of built-in systems: facades, Blum and Hettich hardware, load nodes and technical gaps.
Learn more →
Doors, stairs & panels
Doors, portals, boiserie and railings — joints matched to flooring from one wood batch. Opening geometry, panel layouts, stair fitting.
Learn more →
Our installation principles
Discuss installation
Describe the site and scope — we will prepare an installation plan, schedule and operating recommendations.
Request consultation