Skip to main content
← Installation
CatalogInstallation

Installation of doors and portals


Stable door and portal installation: accurate opening geometry, even gaps and smooth hardware.

  • Colour and grain — one batch; agreed on a sample in your lighting.
  • Joints to floor, skirting and architraves — one profile, no steps.
  • Seasonal gaps in the nodes; care guide and service adjustment after handover.

Substrate and datum zero

Substrate check and datum zero — base for clean junctions.

Moisture under control

Substrate and material moisture within tolerance before start.

Specification for the project

Method, adhesive and finish protection matched to the site.

Handover with guidelines

Geometry check, junctions and operating instructions.


Installation of doors and portals

Preparation and climate

Before work we check humidity and temperature, finish floor condition and substrate stability. Balanced climate for wood reduces seasonal size change and twist risk.

Opening geometry

We check plumb, level and diagonals, measure width and height at several points, relate to finished floor level. Deviations are resolved with a technical compensation plan.

Frame and portal

We set the frame in the design plane with rigid fixing of key points, then assemble portal and architraves with a consistent profile rhythm. Junctions to wall, skirting and floor stay visually continuous.

Leaf and hardware

We hang the leaf, fit locks, hinges, closers and magnetic latches with staged adjustment. Even working gaps, correct rebate and predictable movement without sticking.

Discuss door and portal installation

Request consultation
Door & portal installation | Cardinal Hall