WarrantyTerms and coverage are set out in the contract: up to 25 years on in-house manufactured items and up to 2 years on installation — subject to proper operating conditions.

Our installation principles
Principle 1: Substrate and datum "zero"
Every installation starts with assessing substrate density and flatness and establishing datum zero. Without this, stable junctions and correct node behavior are impossible.
Principle 2: Moisture under control
We control substrate and material moisture before work begins. This reduces the risk of deformation, squeaks and joint opening after handover.
Principle 3: Specification for the project
We choose installation technology by project type and loads: operation sequence, adhesive type, layering, moisture barrier and finish protection.
Principle 4: Handover with a care regime
After installation we check geometry and junctions, provide operating guidelines and perform service adjustments when needed.
Installation of doors and portals
Stable door and portal installation: accurate opening geometry, even gaps and smooth hardware.

Stages

Preparation and climate
Before work we check humidity and temperature, finish floor condition and substrate stability. Balanced climate for wood reduces seasonal size change and twist risk.

Opening geometry
We check plumb, level and diagonals, measure width and height at several points, relate to finished floor level. Deviations are resolved with a technical compensation plan.

Frame and portal
We set the frame in the design plane with rigid fixing of key points, then assemble portal and architraves with a consistent profile rhythm. Junctions to wall, skirting and floor stay visually continuous.

Leaf and hardware
We hang the leaf, fit locks, hinges, closers and magnetic latches with staged adjustment. Even working gaps, correct rebate and predictable movement without sticking.

Post-installation check
We test opening and closing, locks and handles, architrave fit and perimeter joints. We hand over care notes and seasonal service adjustment guidance.
- Unified frame and portal geometry by level and diagonals.
- Even working gaps around the leaf.
- Correct lock, latch, closer and hinge action without force.
- Stable junctions to floor, wall and skirting without visible steps.
- Operating regime and service adjustment after handover.
Installation of panels and boiserie
Stable panel and boiserie installation: unified layout, precise junctions and predictable wall geometry.

Stages

Axial layout and module
Before installation we build a layout grid on main room axes: fields tied to doors, corners, window piers and furniture focal points. This avoids visual drift and random infill strips.

Wall and plane preparation
We check walls for plumb and flatness, add substructure and packers where needed. The substrate must be dry and stable or panels may move after a season.

Technical gaps and stability
For wood and veneer we allow working compensation at perimeters and junctions. This reduces pinching, seam cracks and movement with temperature and humidity.

Integration with doors, moldings and lighting
We align panels with door leaves, portals, cornices and skirting in one profile line. Layout lines match door axes and integrated lighting.

Final adjustment and handover
After installation we check plane geometry, joints and junctions, tune hidden doors and hardware. We hand over care guidelines and service inspection notes.
- Symmetric layout on room axes without random infill.
- Flat, stable panel planes without waves or kinks.
- Correct hidden compensation gaps.
- Consistent joint rhythm with doors, moldings, cornices and skirting.
- Reliable hidden-door operation after seasonal movement.
Installation of stairs and railings
Stable stair and railing installation: precise nodes, structural stiffness and quiet use.

Stages

Bearing base preparation
We check substrates, floor levels, anchorage points and opening geometry. Before assembly we fix working dimensions and tolerances to avoid error stack-up.

Flight and tread fitting
We assemble flights controlling rise and going on every step. We aim for repeatable ergonomics and a visually straight travel line.

Junctions and joints
We fit treads, risers, stringers and landings with tight, correct load transfer into the bearing base.

Railing installation
We set posts, balusters and handrails on one axis, check fixing stiffness and grip comfort. We respect safety height and daily use.

Acoustic and load check
We test under working load: remove micro-play, confirm no squeaks or vibration. After handover we provide operating and service adjustment notes.
- Even tread geometry and consistent step rhythm.
- Rigid fixings without play or parasitic vibration.
- Correct junctions to walls, landings and floor finishes.
- Stable railings and handrails with safety checks.
- No squeaks or extraneous noise under use load.
WarrantyTerms and coverage are set out in the contract: up to 25 years on in-house manufactured items and up to 2 years on installation — subject to proper operating conditions.
Discuss installation
Describe the site and scope — we will prepare an installation plan, schedule and operating recommendations.
Request consultationInstallation FAQ
Subfloor, moisture, method, supervision
What is included in turnkey parquet installation?
Subfloor prep (≤2 mm / 2 m), acclimation, laying by method sheet, sanding, oil or lacquer, skirtings. Indoor humidity 40–60%. Moscow region and Russia-wide.
Do you install third-party products?
Priority is Cardinal Hall manufacture for geometry and joints. Third-party after compatibility audit.
Which parquet laying methods do you use?
Traditional (plywood + PU), modern (silane, no plywood), historic (joists) and artistic (modules/pattern) — locked in the project method sheet.
Do one crew install kitchens, doors, stairs and panels?
Yes — one crew covers parquet, kitchens, doors, stairs and boiserie with shared junctions and contract deadlines.
Where do I book survey and installation?
Showroom Casa Ricca Expo, Rublyovskoye sh. 52A, pavilion 323, Moscow. Quote: contacts#quote. Install across Russia and abroad by schedule.
What is Cardinal Hall's single-batch wood concept?
One wood lot for the entire interior — floor, doors, kitchen, stairs — identical tone for decades.
How long does Cardinal Hall dry timber?
280 days of chamber and thermobaric drying. 6–8% moisture, ±0.5 mm geometry.
What warranty does Cardinal Hall offer?
25 years on products, 2 years on installation.